nr. 65, Țețchea
House · Țețchea · Bihor County
- Cadastral no.50020-C1
- ID8b1b05b7
- Updated
Summary
House at nr. 65, Țețchea, Bihor County. Built in 1990, has 2 floors above ground, covers 170 m² of ground, its gross floor area is 128 m². Its estimated height is ~6.0 m. Its cadastral number is 50020-C1. The locality’s design ground acceleration is ag = 0.15 g.
- Year built
- 1990
- Floors
- 2
- Footprint area (m²)
- 170
- Height (m)
- ~6.0
~ estimate · “unknown”: in no record of the building
Building
- Use
- House
- Year built
- 1990
- Floors
- 2
- Dwellings
- unknown
- Gross floor area (m²)
- 128
- Cadastral number
- 50020-C1
- Building ID
- 8b1b05b7-bc2a-40f1-9448-a891e15e5ba2
- Updated
- 27 September 2026
Shape and roof
- Footprint area (m²)
- 170
- Height (m)
- ~6.0
- Volume (m³)
- ~1,022
- Roof shape
- unknown
Risks
- Seismic zone
- ag = 0.15 g the locality’s design ground acceleration, code P100-1/2013
- Built before the 1978 seismic code
- no
- Flood zone
- unknown
Location
- Street
- unknown
- Number
- 65
- Locality
- Țețchea
- County
- Bihor
- Postcode
- 417608
- Coordinates (lat, lon)
- 47.05380, 22.27147
- Buildings on the street
- unknown
Comparisons
| before 1920 | 32 | |
|---|---|---|
| 1920–1945 | 74 | |
| 1946–1960 | 142 | |
| 1961–1970 | 98 | |
| 1971–1980 | 92 | |
| 1981–1990 | 46 (this building) | |
| 1991–2000 | 63 | |
| 2001–2010 | 13 | |
| 2011 or later | 34 |
Older than 19% of them, newer than 74%.
| 1 floor | 642 | |
|---|---|---|
| 2 floors | 87 (this building) | |
| 3 floors | 6 | |
| 4 floors | 2 | |
| 5 floors | 0 | |
| 6 floors | 0 | |
| 7 floors | 0 | |
| 8 floors | 0 | |
| 9 floors | 0 | |
| 10+ floors | 0 |
87% have fewer floors, 12% as many.
Companies and solar panels
- Companies registered at this address
- none found
- Solar panel check
- not checked yet
Company names, the solar panel check on dated imagery and export are in the app.
Nearby
Buildings nearby
| Address | Built | Floors | Distance |
|---|---|---|---|
| Telechiu 66, Telechiu 1911 · 1 floor | 1911 | 1 floor | 31 m |
| Telechiu 62, Telechiu 1941 · 1 floor | 1941 | 1 floor | 51 m |
| Telechiu 68, Telechiu 1928 · 1 floor | 1928 | 1 floor | 53 m |
| Telechiu 73, Telechiu 1953 · 1 floor | 1953 | 1 floor | 67 m |
| Telechiu 71, Telechiu 1890 · 1 floor | 1890 | 1 floor | 77 m |
| nr. 71, Telechiu 1971 · 1 floor | 1971 | 1 floor | 88 m |
| Telechiu 76, Telechiu 1975 · 1 floor | 1975 | 1 floor | 107 m |
| Telechiu 25, Telechiu 1960 · 1 floor | 1960 | 1 floor | 121 m |
| Telechiu 22, Telechiu 1930 · 1 floor | 1930 | 1 floor | 121 m |
| nr. 24, Telechiu 1922 · 1 floor | 1922 | 1 floor | 123 m |
| nr. 76, Telechiu 1975 · 1 floor | 1975 | 1 floor | 127 m |
| Telechiu 21, Telechiu 1958 · 1 floor | 1958 | 1 floor | 127 m |
| Telechiu 77, Telechiu 1950 · 1 floor | 1950 | 1 floor | 138 m |
| Telechiu 27, Telechiu 1951 · 1 floor | 1951 | 1 floor | 150 m |
| Telechiu 17, Telechiu 1961 · 1 floor | 1961 | 1 floor | 156 m |
| nr. 91, Telechiu 2000 · 2 floors | 2000 | 2 floors | 162 m |
| Telechiu 92, Telechiu 1936 · 1 floor | 1936 | 1 floor | 167 m |
| Telechiu 91, Telechiu 1921 · 1 floor | 1921 | 1 floor | 171 m |
| Telechiu 28, Telechiu 1933 · 1 floor | 1933 | 1 floor | 174 m |
| nr. 82, Telechiu 1994 · 1 floor | 1994 | 1 floor | 176 m |
Questions
When was the building at Țețchea 65 built?
The building at Țețchea 65 was built in 1990.
How many floors does the building at Țețchea 65 have?
The building at Țețchea 65 has 2 floors above ground.
What is the cadastral number of the building at Țețchea 65?
The cadastral number is 50020-C1. The official record opens from the “Building” table.
What is the seismic risk at Țețchea 65?
The locality’s design ground acceleration is ag = 0.15 g (seismic code P100-1/2013). The building was built after the 1978 seismic code. Only a technical survey sets a building’s seismic risk class.
The same data, from your AI assistant or the API
Connect baseray to ChatGPT or Claude and ask about any building in Romania and Czechia, or read its record from your own code.
AI assistant
What do you know about the building at Țețchea 65? Which companies are registered there?
API
This building’s record as JSON:
curl "https://api.baseray.ai/v1/buildings/8b1b05b7-bc2a-40f1-9448-a891e15e5ba2" \
-H "Authorization: Bearer $BASERAY_API_KEY"const response = await fetch("https://api.baseray.ai/v1/buildings/8b1b05b7-bc2a-40f1-9448-a891e15e5ba2", {
headers: { Authorization: `Bearer ${process.env.BASERAY_API_KEY}` },
});
const building = await response.json();import os
import requests
response = requests.get(
"https://api.baseray.ai/v1/buildings/8b1b05b7-bc2a-40f1-9448-a891e15e5ba2",
headers={"Authorization": f"Bearer {os.environ['BASERAY_API_KEY']}"},
timeout=30,
)
building = response.json()