Skip to content

Drum comunal Dc 126 67, Oroiu

House · Oroiu · Mureș County

Summary

House at Drum comunal Dc 126 67, Oroiu, Mureș County. Built in 1964, has 2 floors above ground, covers 190 m² of ground, its gross floor area is 362 m². Its estimated height is ~6.0 m. Its cadastral number is 52409-C1. The locality’s design ground acceleration is ag = 0.15 g.

Year built
1964
Floors
2
Footprint area (m²)
190
Height (m)
~6.0

~ estimate · “unknown”: in no record of the building

Building

Use
House
Year built
1964
Floors
2
Dwellings
unknown
Gross floor area (m²)
362
Cadastral number
52409-C1
Building ID
66d3927b-e311-41fa-8ee2-fe73ebd0ed0b
Updated
26 September 2026

Shape and roof

Footprint area (m²)
190
Height (m)
~6.0
Volume (m³)
~1,140
Roof shape
unknown
10 mN
Outline · seen from above, north up

Risks

Seismic zone
ag = 0.15 g the locality’s design ground acceleration, code P100-1/2013
Built before the 1978 seismic code
yes
Flood zone
unknown

Location

50 mN
The building and its neighbours · seen from above, north up · Drum comunal Dc 126 highlighted this building same street other buildings
Street
Drum comunal Dc 126
Number
67
Locality
Oroiu
County
Mureș
Postcode
547074
Coordinates (lat, lon)
46.54733, 24.35771
Buildings on the street
31

Buildings in Band: statistics

Comparisons

Age, against the street
older than 20% of the buildings on the street with a known year
Year built in Band696 buildings with the value known
Year built in Band
before 1920
13
1920–1945
59
1946–1960
175
1961–1970
151 (this building)
1971–1980
93
1981–1990
67
1991–2000
85
2001–2010
19
2011 or later
34

Older than 43% of them, newer than 35%.

Floors in Band926 buildings with the value known
Floors in Band
1 floor
781
2 floors
120 (this building)
3 floors
25
4 floors
0
5 floors
0
6 floors
0
7 floors
0
8 floors
0
9 floors
0
10+ floors
0

84% have fewer floors, 13% as many.

Companies and solar panels

Companies registered at this address
none found
Solar panel check
not checked yet

Company names, the solar panel check on dated imagery and export are in the app.

Nearby

Other buildings on Drum comunal Dc 126

Address Built Floors
Drum comunal Dc 126 89A, Oroiu 1905 1 floor
Drum comunal Dc 126 90, Oroiu 1957 2 floors
Drum comunal Dc 126 97, Oroiu 1952 1 floor
Drum comunal Dc 126 118A, Oroiu 1970 1 floor
Drum comunal Dc 126 120, Oroiu 1960 1 floor

Buildings nearby

Address Built Floors Distance
nr. 191, Oroiu 1966 1 floor 177 m
nr. 192, Oroiu 1965 1 floor 177 m
Strada -Fn- 183, Oroiu 1967 1 floor 180 m
Strada -Fn- 195, Oroiu 1972 1 floor 187 m
Strada -Fn- 196, Oroiu 1968 1 floor 189 m
nr. 196, Oroiu 1956 1 floor 195 m
nr. 190, Oroiu 2001 1 floor 195 m
nr. 74, Oroiu 1963 1 floor 199 m
nr. 187, Oroiu 1952 1 floor 207 m
nr. 186, Oroiu 1955 1 floor 219 m
nr. 184, Oroiu 1970 1 floor 306 m
nr. 181, Oroiu 2005 2 floors 346 m
nr. 56, Oroiu 1950 1 floor 390 m
nr. 79, Oroiu 2018 1 floor 606 m

Questions

When was the building at Drum comunal Dc 126 67, Oroiu built?

The building at Drum comunal Dc 126 67, Oroiu was built in 1964.

How many floors does the building at Drum comunal Dc 126 67, Oroiu have?

The building at Drum comunal Dc 126 67, Oroiu has 2 floors above ground.

What is the cadastral number of the building at Drum comunal Dc 126 67, Oroiu?

The cadastral number is 52409-C1. The official record opens from the “Building” table.

What is the seismic risk at Drum comunal Dc 126 67, Oroiu?

The locality’s design ground acceleration is ag = 0.15 g (seismic code P100-1/2013). The building was built before the 1978 seismic code. Only a technical survey sets a building’s seismic risk class.

The same data, from your AI assistant or the API

Connect baseray to ChatGPT or Claude and ask about any building in Romania and Czechia, or read its record from your own code.

AI assistant

Ask, for example:
What do you know about the building at Drum comunal Dc 126 67, Oroiu? Which companies are registered there?
Connect ChatGPT or Claude

API

This building’s record as JSON:

curl "https://api.baseray.ai/v1/buildings/66d3927b-e311-41fa-8ee2-fe73ebd0ed0b" \
  -H "Authorization: Bearer $BASERAY_API_KEY"